Crystal Cave
Temporarily closed: Last open September 7, 2026 (The 2026 guided tour season has ended; the conservancy says final public tours ran through September 7, 2026 and Crystal Cave Road closed September 8, 2026 for repairs and construction.). The park expects tours to resume in late spring 2027 and the conservancy expects normal operations in 2027. Construction on Crystal Cave Road may affect part of the 2027 season. That is an estimate, not a reopening date. Find Caves will not list it as visitable until the manager confirms a reopening date.
A marble cave in Sequoia National Park visited only on guided tours, reached by a steep half-mile walk from the cave parking area. Tickets are sold online in advance by the park partner, not at the cave.
What to know
- Status
- Temporarily closedThe park expects tours to resume in late spring 2027 and the conservancy expects normal operations in 2027. Construction on Crystal Cave Road may affect part of the 2027 season.
- Visit style when open
- Guided cave tour
- Stairs
- Steep, stair-heavy half-mile trail (described by the conservancy as equal to a 20-story building)
- Wheelchair access
- Not wheelchair accessibleThe conservancy says wheelchairs cannot be accommodated.
- Cave temperature
- About 50°F
- Features
- Formations, Bats